    Aerospace and defense · Program operations

    Aerospace company

    Program operations reporting across a portfolio of cost-plus and fixed-price programs, inside an accredited environment.

    down 45%
    Reporting effort
    down 35%
    Variance turnaround
    down 20%
    Review preparation

    The challenge

    Program managers spent days each month assembling status, cost and schedule variance from four systems into a format the review board would accept. By the time a variance was explained, the month had moved on.

    What we did

    Business experts rewrote the reporting standard first, so that every program produced the same evidence in the same order. Engineers configured the packaged program-operations solution to assemble the pack from the systems of record, with the proof layer checking every figure against the source before a human ever sees it. Anything it cannot prove is flagged rather than filled in.

    Systems connected

    • Earned value management
    • ERP and finance
    • Scheduling
    • Document management
    • Program review reporting

    Timeline

    • Weeks 1-3Reporting standard rewritten and agreed with the review board. Baseline captured.
    • Weeks 4-8Joint build inside the accredited environment against three pilot programs.
    • Weeks 9-12Rolled to the wider portfolio, measured against the baseline month.